Practice Aptitude Questions (Data Interpretations) With Solutions Set-49:
Dear Readers, Important Aptitude Questions for SSC/FCI Exam was given here with solutions, candidates those who are preparing for those exams can use this material.
Directions (Questions 01-05): Study the following bar-graph and pie-chart carefully to answer the following questions.
Directions (Questions 01-05): Study the following bar-graph and pie-chart carefully to answer the following questions.
a)
68 hours
b)
72 hours
c)
71 hours
d)
75 hours
e)
84 hours
2).What is the time taken by Shyam to reach
his destination upstream?
a)
272 hours
b)
245 hours
c)
240 hours
d)
232 hours
e)
268 hours
3).If the speed of boat C is increased by 40 %
and the speed of stream decreases by 20% then what is the difference between
the time taken by the boat now and that taken previously to travel 200 km?(Assume
opposite direction of stream)
a)
28×(6/23)
b)
22×(4/5)
c)
20×(4/5)
d)
35×(5/6)
e)
18×(5/6)
4). If the speed of boat D increases by 10%
then what is the approximate time taken by Shyam to reach 500 km by boat D? (Assume
opposite direction of stream)
a)
88 hours
b)
92.6 hours
c)
68 hours
d)
78 hours
e)
44 hours
5).What is the ratio of the time taken by boat
C to that taken by boat D? (Assume opposite direction of stream)
a)
9 : 7
b)
7 : 5
c)
5 : 3
d)
4 : 3
e)
3 :2
Directions
(Questions 06-10): Study the given table carefully
to answer the following questions.
The table shows the time (in days) taken by five men who do different
types of work.
Types of
Work
|
Building
construction
|
Road
construction
|
Bridge
construction
|
Tower
installation
|
Name
|
||||
Rituraj
|
20
|
18
|
24
|
26
|
Amarkant
|
22
|
24
|
20
|
28
|
Vishwamohan
|
18
|
26
|
28
|
24
|
Prithusen
|
24
|
22
|
30
|
20
|
Latiteshwar
|
26
|
20
|
26
|
30
|
6).How many days would Rituraj, Amarkant and
Prithusen take to construct a building when they work together?
a)
5×(4/5) days
b)
4×(1/3) days
c)
8×(1/2) days
d)
53/181 days
e)
6×(2/3) days
7).How many days would Vishwamohan, Laliteshwar
and Riturraj take to instal 10 towers when they work together?
a)
90 days
b)
88.13 days
c)
92.92 days
d)
87 days
e)
85.41 days
8).The bridge construction work is initiated
by Rituraj, Prithusen and Latliteshwar together. After four days Laliteshwar
leaves the work and Amarkant joins them. In how many days will the work be
completed?
a)
7×(13/25) days
b)
5×(72/143) days
c)
10×(68/138) days
d)
4×(24/65) days
e)
12×(12/65) days
9).What would be the time taken to construct 5
buildings and 4 different roads when Rituraj, Prithusen and Vihwamohan work
together?
a)
65.61 days
b)
61.53 days
c)
64.45 days
d)
62.63 days
e)
68.32 days
10).Rituraj and Amarkant got Rs 50000 for
building construction. What is the share of Rituraj?
a)
Rs 25000
b)
Rs 26190.47
c)
Rs 24130.5
d)
Rs 22990.7
e)
Rs 28970.5
Answers:
1). d) 2).
b) 3). a) 4). b) 5). e) 6). d) 7).
b) 8). d) 9). d) 10). b)
Check here below
for Detailed Solution for the above questions:
1. Time taken by boat A to travel 200 km =
200/(18-10) = 25 hrs
Time taken by boat B to travel 200 km = 200/(14
– 12) =100 hrs
:. Read different = (100 – 25) = 75 hours
So
the answer is: D
2. Total distance travelled by Shyam =1000
km
Distance covered by boat A = 1000 × (40/100) =
400 km
Time taken by boat A = 400/ (18 – 10) =50
hours
Time taken by boat B = [1000 × (18/100)] / (14
– 12) = 90 hours
Time taken by boat C =[1000 × (26/100)] / (10
– 6) = 65 hours
Time taken by boat D = [1000 × (16/100)] / (14
-10) =40 hours
:. Time taken by Shyam = (50 + 90 + 65 + 40 )
245 hours
So
the answer is: B
3. Speed of
boat C after 40% increase in its speed = 10 × (140/100) = 14 kmph
Speed of stream
after 20% decrease = 6 × (80/100) = 4.8 kmph
Now, time taken
by boat C = 200/(14 - 4.8) = 200/9.2 = 21 ×(17/23) hours
Time taken by
boat previously = 200/(10 – 6) = 200/4 =50 hours
:. Difference =
(50 – 21× 17/23) = 28× 6/23 hours
So
the answer is: A
4. New speed of
boat D = 14 × (110/100) = 15.4 kmph
Time taken to
travel 500 km = 500/(15.4 – 10) = 92.54 ~ 92.6 km
So
the answer is: B
5. Time taken
by boat C = x km/(10 + 6)
Time taken by
boat D = x km /( 10 + 14)
:. Read ratio = (x/16)
: (x/24) = 3 : 2
So
the answer is: E
6. Part of
building construction by Rituraj in one day = 1/20 by Amarkant = 1/22 and by
Prithusen = 1/24 work of building construction done in 1 day by all three
together= (1/20 + 1/22 + 1/24) = 181/1320
ie, they
construct a building in 1320/181 = 7 ×53/181 days
So
the answer is: D
7. The part of
work of tower installation done by Vishwamohan in one day = 1/24, that
Laliteshwar in one day = 1/30 and that by Rituraj in one day = 1/26
The part work of
tower installation done by all three together in one day
=1/24 + 1/30 +
1/26 = 177/1560
:. 1 tower
installation work is done in 1560 /177 days
:. 10 tower
installation work is done in (1560 ×10)/177 = 88.13 days
So
the answer is: B
8. The part of
work of bridge construction done by Rituraj, Prithusen and Laliteshwar in 4 days
= (1/24 + 1/30 +
1/26) × 4 = (177 × 4) / 1560 = 708/1560 =59 / 130
The part of work
of bridge construction done by Rituraj, Prithusen and Amarkant in one day
= (1/24 + 1/30+
1/20) =(5 + 4 + 6)/120 = 1/8
After 4 days the
remaining work = 1- (59/130) = (130 – 59)/130 = 71/130
Now, 71/130 work
is done by Rituraj,Prithusen and Amarkant in
(71/130) / (1/8)=
(71 × 8)/130= 568/130 = 4 ×(24/65) days
So
the answer is: D
9. When
Rituraj, Prithusen and Viswamohan work together, the work of building
construction done by them = (1/20 + 1/24 + 1/18 ) = 53/360 per day work of road
construction
(1/18 + 1/22
+1/26) = 359/2574
53/360 part of
building construction work is done in [360/53) × 5] = 33.96 days
359/2574 part of
road construction is done in 1 day.
4 roads are
constructed in [2574/359) × 4] = 28.67 days
:. Total time
taken = (33.96 + 28.67) = 62.63 days
So
the answer is: D
10. Ratio of
work done by Rituraj to that by Amarkant in one day in building construction
Or, Rituraj : amarkant = 1/20 : 1/22 = 11 : 10
Total wage =
500000
:. Share of
Rituraj = 5000 × (11/21) = Rs 26190.47
So
the answer is: B